Home / Industries / Geolocation

GIS field surveys with Cluster Survey

A survey platform for utilities, municipalities and infrastructure owners. Field crews capture each asset's location and attributes on a smartphone; supervisors check the work at two levels before a survey area is closed.

Within 3 metrescapture accuracy
Works offlinein remote areas
Two QC levelsbefore completion
Any smartphoneno survey kit

In the field

What the surveyor works with.

Each surveyor is given a scene, a small area on the map. Every asset in it gets a category, a unique ID, the attributes the project asks for and a position, checked against existing records as it is saved.

  • FormsAsset categories, forms and attributes set per project
  • Existing dataImported before the survey and matched as new captures come in
  • PresenceCaptures accepted only from the surveyor's location
  • AccessRights by role: admin, vendor, supervisor, surveyor, QC
CLUSTER SURVEY · SCENE G4-S12New asset
CategoryElectric pole
Asset IDEP-4471
Material · HeightRCC · 9 m
ConditionGood
Existing recordMatched: EP-4471 (2023)
GNSS fix · ±2.4 m
Save to scene

Illustrative screen

From survey to scene

How a survey area is divided.

Select a level to see who sets it up.

Workforce geofencing

Headcount inside a work area, during the shift.

An Android app and admin portal. The admin draws geofences on a map and adds employees by mobile number; the app records entries and exits and shows each person's location, so the count inside and outside each zone is known at any time.

Workforce · Site North● Live
Inside142
Outside9
Zones4
EmployeeZoneEventTime
Employee 0412Plant gateEntry06:58
Employee 0388WorkshopEntry07:02
Employee 0291StockyardExit07:05

Case study

A survey company that retired DGPS.

Case study · Cluster Survey

From 15 survey points a day to 100

A survey company's teams replaced DGPS with Cluster Survey on their phones. A surveyor now records about 100 points a day, where DGPS allowed 15 to 16, and time spent on field surveys has fallen by 75 percent.

100points per surveyor per day, against 15–16 with DGPS
75%less time spent on field surveys
Mostsurveys now run without DGPS

Contact

Talk to us about your survey.

The area, the assets to capture and how many crews will work on it.